Community · Solar Street Lighting

Lira Municipal Street Lighting

A lit corridor, with no cable to steal and no bill to pay.

Location
Lira
Scale
120 poles
Commissioned
2023
Poles deployed
120Poles deployed
Metered energy cost
ZeroMetered energy cost
Battery autonomy
3+ nightsBattery autonomy
Trenching required
NoTrenching required

Figures are representative of work delivered in this sector and are rounded. Full project documentation available on request.

01 — The brief

What we walked into

A 120-pole solar street lighting deployment along a municipal corridor, delivered without trenching, cabling or a grid connection — and therefore without a metered energy cost or the copper runs that had made previous lighting a repeated theft target.

The council wanted the main corridor lit and had twice seen conventional lighting defeated by the same two problems: the cost of extending and metering supply, and the theft of copper cabling almost as fast as it was laid. Any solution that involved a cable run was going to fail the same way a third time.

02 — The approach

What we engineered

We ran a photometric design first, setting pole spacing and luminaire output against the lux level the corridor actually required — the step most often skipped, and the reason many solar lighting schemes look adequate on paper and dim in reality. Each pole is a self-contained plant: monocrystalline panel, LED luminaire, LFP battery and an intelligent controller with dusk-to-dawn and motion sensing. Dimming during low-traffic hours stretches autonomy to more than three nights, so a run of overcast weather does not darken the street. Foundations were engineered for local wind loading.

Engineering detail

  • Photometric design set spacing to a required lux level, not a guess
  • Each pole self-contained — no cable run, no theft target
  • Motion dimming stretches autonomy beyond three nights
  • Foundations engineered to local wind loading
  • Deployment critical path was foundations, not utility approvals

03 — The result

What it delivers now

The corridor is lit, the council carries no metered energy cost for it, and there is no copper in the ground to steal. Deployment took a fraction of the time a cabled scheme would have needed, because the critical path was pole foundations rather than trenching and utility approvals. Evening trade along the corridor extended noticeably — the outcome the council actually wanted, as distinct from the lighting they asked for.